Since 1969
DEV

Aguila 32 S&W Long Lead Soft Point 98 Grain 50 Rounds

Aguila Ammunition # 1E322340 |  Item # 162-1E322340
  • Aguila 32 S&W Long Lead Soft Point 98 Grain 50 Rounds
  • Aguila 32 S&W Long Lead Soft Point 98 Grain 50 Rounds
  • aguila-ammunition
$37.99
$0.76 Per Piece
Quantity
Status: In Stock
  • This item has restrictions that may prevent its sale by age or location.

DESCRIPTION

32 S&W Long Lead Soft Point 98 Grain 50 Rounds
by Aguila


Aguila has made an ammunition that is perfect for stocking up or for hitting the range with friends and family. Ideal for revolvers and popular among ISSF pistol competitors and cowboy action shooters, this straight-walled, rimmed round features a lead bullet and offers consistent accuracy and performance round after round.

Specifications and Features:

  • Cartridge: 32 S&W Long
  • Grain Weight: 98 Grains
  • Quantity: 50 Rounds
  • Muzzle Velocity: 705 fps
  • Muzzle Energy: 108 lb/ft
  • Bullet Style: Round Nose
  • Reloadable Brass Case

Was this information helpful?

  • Shipping Weight: 1.09lbs. - Please Note: Most packages will require extra packing materials.
  • You must be 21 years or older to purchase loaded ammunition and hazardous items.
  • Ammunition must be shipped via UPS Ground or Fedex Ground methods.
  • Due to Department of Transportation regulations, we cannot accept returns on ammo.
  • This product can only be shipped within the continental united states.
  • This item may have additional shipping charges if shipped by air.
  • Due to shipping regulations this item can not be shipped through the postal service.
  • Regulations may not allow this item to be shipped to specific states or zip codes.
There are no special offers for this product at this time.
No manufacturer information available.